ALL DOCUMENTS MUST BE SUBMITTED TO THE MUNICIPAL OFFICE.
- Important: PBI will only accept new permit applications directly from the municipality to ensure that development approval has been granted.
- Remember to submit the Residential - Permit Information Form (download below) with your plan review documents. A municipal official must complete the top portion and assign a PBI number before submitting all plan review documents to PBI.
- Remember to complete and sign the E-Mail Consent Form at the bottom of the Plan Review Checklist (download below).
- Ask the municipal office if they require a geotechnical report, as per their zoning bylaws. If a geotech report is required, ensure that the Structural Engineer designing your foundation receives a copy of that report and references it in the foundation designs.
Plan Review Requirements for Typical Project Types
Contact PBI at 306-536-1799 for requirements for unique projects or for projects not included below.
Click on any underlined red text on this webpage for more information.
Accessory Building
Addition
Attached Garage
Basement Development
Boat House
Building Moved In
Deck
Detached Garage
Dwelling
Foundation Replacementc
Mobile (Manufactured) Home
Pole Building
Renovation
Retaining Wall
RTM
Secondary Suite
Solar Panels (PV or Hot Water)
Sunroom (Prefabricated)
- Residential - Plan Review Checklist - Details what is required for a plan review for common residential building projects.
- Residential - Permit Information Form - Fill in the bottom portion, then save as "PIF - Municipality Name", and email to the municipal office, with your plan review documents. The municipal official must complete the top portion and assign a PBI number before submitting all plan review documents to PBI.
After Building Permit is Issued
- Plan Review Report - Ensure you receive a copy of the plan review report from the municipal office at the time of building permit issuance. There is important information in this report about your building project, such as the stages of construction to call for site inspections, Building Official contact details, NBC compliance notes, missing information still to be submitted, etc. PBI only emails this report to the municipal office, so ask the municipality to e-mail you a copy if you did not receive it with your building permit.
- Site Inspections - After the plan review is completed and the building permit is issued by the municipal office, the owner or contractor must call PBI for all required site inspections at certain stages of construction, as identified in the Plan Review report.